The Ram- and injection head is used in conjunction with the G¼" ram injection lance in slightly sandy soils for the purpose of sealing or consolidation. An enormous advantage of the Ram- and injection head is the possibility of flushing in during the ram injection process. In this way, the exit holes do not become clogged with the fine sand.
Work process
Connect ram lance with ram and injection head
Mount Geka coupling
Position the ram lance
Connect water until it emerges from transverse holes
Drive ram lance to desired depth (depths up to 3 m)
Connect the injection connection to material delivery line
Inject
After the injection process, pull the ram lance with ram and injection head out of the ground and clean it. For short lengths, it is possible to pull the ram injection lances manually by the handle.
Item toevoegen aan winkelwagentje
Voeg alle geselecteerde items toe aan het winkelmandje
Verwijder item uit winkelwagen
Kijklijst
Kijklijst
Item niet op voorraad Voorbestelling mogelijk
Item in lage hoeveelheid op voorraad
Artikel in voldoende hoeveelheid op voorraad
Artikel in de instroom
Het artikel is opgenomen in een lopende actie
naar boven
LOG IN OP HET DEALERPORTAAL
Log in op de DESOI reseller portal met uw toegangsgegevens. Gebruik hiervoor uw e-mailadres en wachtwoord.